1 thought on “nahmu jewelry wholesale Gypsum mold production tutorial”

  1. unique body jewelry wholesale Preparation materials: mold, gypsum powder, water, clip, bottom plate, plug, stir stick, basin or barrel. It is confirmed and intact before making. (As shown in the figure below)

    Thenaping of the mold opposite and then clamped with a clip (Note: the clip used must have strength), and then check whether the counterpart is aligned (Objective: a. At the time, gypsum pulp will not be wasted from the cracks and wasted plaster powder .b. The surface of the gypsum doll was smoother when the mold was out.)

    The mixing: Add half a bowl of water to the bowl, and then add an appropriate amount of plaster Powder (the proportion of water to gypsum powder is about 1: 1.8), and then stir well to make it no bubble. If the gypsum powder is fixed, the proportion of water is slightly more; if the gypsum powder is slower, the proportion of water is less, and it is flexible and self -determined. (Note: Any gypsum powder must have intensity after being curious. There is no intense gypsum powder that cannot be used, and the time of mixing gypsum powder should not be too long. It is controlled in a half -divide type, otherwise the gypsum powder will dry in a short time.)

    Pill the first layer of pulp: pour the stirred gypsum pulp into the mold, rotate the mold quickly, make the gypsum slurry stick to the mold evenly, and place the mold in flat ground (such as gypsum pulp in the mold in the mold. Internal unsuits can rotate the mold; if the gypsum pulp is frozen in the mold, the mold cannot be rotated, otherwise the gypsum image poured out will cause cracks. In addition, the thickness of the gypsum pulp poured into the mold for the first time must be appropriate, such as Too thick gypsum pressure transfers to the mold, then the poured gypsum image will deformed; if it is too thin, it is easy to break and cause production failure)
    If in the second layer of pulp: after completing the third step Put on one side for 3-5 minutes, etc. After the first floor is dry, follow the second step and the third section for the second pulp. After the gypsum pulp on the endometrium is solidified for the second time or the third paste, the next step must be performed before each layer. Its solidification time is different)

    If back to the bottom: pour the adjusted gypsum slurry into the gypsum image product, and then cover the foundation plate as shown in the figure. (The protruding part of the bottom plate is facing the mold), then the gypsum image stands up, shake the gypsum statue back and forth, and fills the gypsum like the gypsum paste inside the plaster. Local, repairs the gypsum like excess plaster at the bottom. (As shown in the figure below)

    Mlasizing like white embryo doll production tutorials
    In offspring and gypsum solidarity, put the gypsum image in flat ground, remove the clip first, and then start with both hands from the bottom slowly. Slowly peel off the mold. (When delaying, you must slowly remove the mold in the mold. The mold becomes softened and then removed). Remove the foam plate at the bottom and repair the excess gypsum at the bottom with a small knife. The cosmetic knife is opened with a citizen of the bottom (comparison of the gypsum powder after the gypsum powder is compared after the end condensation of the gypsum powder. Difficult to open).

    plaster like white embryo doll production tutorial
    plaster like white embryo doll production tutorials
    The gypsum products that are repaired. Dip water and gypsum powder repair the air bubble. Then use a knife to scrape the excess plaster of the product.

    mold maintenance: After each use, wash the mold, and after drying, place it in a cool and dry place. This mold should not expose.

Leave a Comment